You know what is a great idea when you have exactly seven
days before your housewarming/meet-the-neighbors party? To gut-renovate your
powder room.
Can you sense my sarcasm in that statement? Good.
All-in-all, it was a pretty smoothly done project, but we definitely
encountered some obstacles that rearranged that original (and tight) timeline
for the various stages and we finished the last detail the morning of the
party. BUT WE GOT IT DONE! We learned some things (or rather, hubs did…he is
the primary renovator while I help occasionally but mainly keep the crib
midgets out of the construction zone…and have design input, of course!) and the
entire project was under $800 from start to finish, not including the couple of
new tools we bought for the project or the gas mileage from the DAILY (...and I mean several per day) trip(s) to
either Lowe’s or Home Depot.
Demolition was a new fun time for us—we had never completely
demo’d a room—taking out ALL of the old was very cleansing. Plus, sledgehammering all the things is kind of awesome when you need to get out some aggression. It was also nice to
take things apart with the knowledge that none of it needed to be salvaged.
There were challenges to some of the removals—baseboards being glued rather
than nailed, so wall damage. And, finding an old toilet drain (we think?) while
we were demo-ing the floor tile and damaging the sub-floor…oops!
Here are the before's:
Brown and yellow, and more brown and yellow....The tile itself was actually very well installed and had it been another color I would have kept it and worked around it--I even considered a cheaper option of painting the tile--which would have showcased the pattern. I had been reading several blogs about painting floor tile--but in the long run, the paint was not likely to last more than 2-5 years without starting to show wear and we had to take into consideration that this bathroom was going to be high traffic for our family and for guests.
Gut complete! After we had removed everything, Hubs had to go out and buy a grinder to get the majority of the old thin-set off the concrete subfloor (It was only $40). Then, he had to patch the damaged area to get some semblance of a level floor in order to lay the new tile. The patch took almost a full 48 hours to set up enough so that we could start the floor--hence the timeline adjustment and subsequent last minute finishing. In the mean time, hubs started tiling the left side of the area and I put two coats of plain white paint. For now, the bathroom is staying white because we were under such a time crunch that it was just easier to paint the ceilings and walls all white rather than worry about a color selection. While I know changing the paint color once the toilet and vanity are in will be a challenge, time was of the essence--and anything was going to be better than the pee-colored yellow that was on the walls.
We decided to keep it simple and crisp. A subway style ceramic
tile that has gray accents with gray grout (hopefully will hide a lot of future
stains unlike white grout), a dark gray vanity, brushed nickel fixtures and
light wood accents.
And the finished product! YAY!
(With the exception of this picture--Hubs was out getting the toilet paper holder when I took this...I also realize that maybe I should take a picture sans toddler-stool but really, this is REAL LIFE and we have potty-training children, so there.)
There you have it--7 days of all evening (and early morning) work later, and we have a new powder room. Now, to recover the credit cards a little before the next project!



























